Quote packs, customer packs, handover packs and certificate details, prepared and checked for every job. Records filed, key dates tracked, and you ready the day your assessor calls. All in your name, never ours.
Four things every MCS installer has to get right. We take all four off your desk.
We prepare and check. Your Technical Supervisor signs and you register the certificate, so you stay in control of your MCS certification. Amply doesn't certify installations.
Your time on each step, doing it yourself versus with Amply. Set-up is a one-off 15 minutes before your first job.
| Every job | Your time on your own | Your time with Amply |
|---|---|---|
| Quote with MCS wording, performance estimate checked | 30–45 min | About 10 minOne survey form on your phone. We build and check the quote. |
| Customer pack: Customer Commitment, terms, privacy notice, cancellation form | 20–30 min | About 2 minForward the pack and signing link. We build it. |
| Customer signing, chasing and filing the signed copy | 10–20 min | 0 minSigned online, filed and unsigned quotes flagged for you. |
| Handover pack: warranties, manuals, certificates, MCS handover document | 45–60 min | About 5 minPress "Solar job done". We build and check the pack. Your TS signs. |
| Job file, records and audit trail for your assessor | 15–30 min | 0 minFiled, numbered and indexed automatically. |
| Certificate on the MCS Installation Database | 20–40 min | 0 minWith certificate lodgement, we enter it for you. |
| Total per job | About 2½–4 hours | About 17 minutes |
Estimates for a typical home PV job. "On your own" certificate time from published industry figures; other times are our estimates. Your own times will vary.
Move the slider to your typical month.
Estimate: 2½ hours of paperwork saved per job (3 hours with certificate lodgement), an evening = 3 hours. *Assumes an install day of 2 people × 12 hours. Illustration only.
Every one of these costs time, money or your certification. Every one of them is handled.
10 minutes on your phone after the survey. Your quote pack is back the next working day.
Every job already filed, numbered and indexed. You're ready on Monday.
Reminders at 30 days, 7 days and on the day. One tap to give us the new date.
The deadline sits on every job and gets chased before it's missed. Or we lodge it for you.
Their signed acceptance records the date and every document they confirmed receiving.
G98 details included and chased automatically. G99 tracked and chased as an add-on.
MCS certification isn't a one-off. These are the things that keep it, and where we take the weight.
We set everything up and check it before your first quote, so every pack is right from day one.
This is what you and your customer see at each step. Example details shown.
Customer, roof, shading, energy use, kit and price. Photos and your design go straight from your phone, and it saves as you go.
The quote with MCS's own wording for the estimate, shading, remote survey and battery notes, and clear steps for what to do next.
Every document MCS expects the customer to have, numbered in reading order. If anything is missing, the pack doesn't go out until it's fixed.
They confirm they've had every document, including their 14-day right to cancel, then sign by drawing or typing their name. It's all in your name, not ours.
The job, customer and kit are already filled in. Add serial numbers, photos, the electrical certificate and meter details.
Your handover pack ready to sign, the certificate deadline and every detail for the MCS Installation Database on one sheet. The job file is closed off and kept for your assessor.
| MPAN | 1012345678901 |
| System size | 5.4 kWp |
| Generation meter | Serial and reading added |
| Handover pack | Checked |
Between jobs, we watch the dates that keep your certification safe and nudge you before anything runs out. One tap tells us it's done.
No staff to hire, no software to learn, no licences. One small monthly fee and a set price for each job we do.
Lower price per job for busier installers. Ask us for the price list.
We get your paperwork, templates and records ready while you focus on training and your assessed install. Your certification body makes the decision.
Our packs are built to MCS's 2026 requirements, so your paperwork moves with you, Customer Commitment included.
Keep selling and installing. We prepare, check and file every PV job, and keep your dates in check.
Send us your next survey and see the whole thing working on a real job, in your name.
Amply prepares and checks paperwork on your behalf. We don't certify installations. Strictly private and confidential.